KTTZ tower located in the C16 commuter lot will receive updated painting starting June 3rd. The process should last through the month of June.
|
Posted:
5/31/2019
Originator:
David Small
Email:
david.small@ttu.edu
Department:
Ops Div Engineering Services
Categories
|